Please verify all the information is correct for your reorder request and add it to cart. If an image or file is not showing it has been over a year since you last ordered. Please upload again or contact us if you no longer have the file. Prices may have changed as well due to material costs or other factors.
About this decal
Project Timeline: original single-color cut-vinyl artwork. Item # CalendarCX027.
Choose your size, vinyl color, indoor or outdoor material, and optional reversed orientation. Size refers to the longest artwork dimension.
A small detail. A personal statement.
A clean, single-color cut-vinyl design with open areas that reveal your surface. The backing liner and transfer tape help carry the design during installation; neither stays behind.
Choose the size for your space and the vinyl for your surface. For help, send our team the original item number, desired size and surface details.
Dana Point-inspired application ideas. Match the vinyl to your surface; designs shown are illustrative examples.
Vehicles
Suitable glass and smooth panels with outdoor vinyl.
Laptops & gear
Clean, smooth surfaces with an appropriate material.
Toolboxes
Smooth finished surfaces; check coatings first.
Walls & rooms
Suitable smooth indoor walls with wall vinyl.
Decal questions, answered
Does the decal have a background?+
This is cut vinyl. Open areas reveal your surface; the backing liner and transfer tape are temporary installation layers and do not remain behind.
How is the size measured?+
Size refers to the longest side of the actual design, not the backing liner. The other side remains proportional. Measure the available space before selecting your size.
Can I choose a different color?+
Choose from the original color and specialty-media options above. Some colors are limited to indoor or outdoor material. The configured price updates with your eligible selections. Screen appearance can vary from physical vinyl.
Which material should I choose?+
Choose indoor wall vinyl for suitable smooth interior walls or outdoor vinyl for suitable glass and finished vehicle surfaces. Texture, coatings and paint condition affect adhesion. Specialty and heat-transfer media can require different preparation and application instructions.
What does reversed mean?+
Reversed flips the artwork left to right; it does not change the adhesive side. For an inside-glass application, confirm the material and viewing direction with our team before ordering.
How do I apply cut vinyl?+
Prepare and dry the suitable surface. Use the transfer tape to keep the design together, remove the backing liner, position the design and smooth through the transfer tape. Peel the tape back slowly, checking that the vinyl stays on the surface. Follow the complete cut-vinyl installation guide for your project.
Can you help with a custom version?+
Contact Vinyl Disorder with the original item number, desired size, surface details and the changes you need. Our team can help you choose an appropriate custom order.
What Vinyl Disorder customers are saying
Real customer reviews from across the Vinyl Disorder store.
Customer Reviews
Overall rating: 4.9 / 5 from 8142 reviews.
These rock! Great quality and bright colors. Perfect for sticker-bombing any and everywhere
Redecorating my room in an Aztec/Mayan theme and used 5 different decals on my closet door. They were so easy to put on, very inexpensive, and they look great. I love them!
I love my cornhole wrap that I purchased from vinyl disorder I successfully installed it on my cornhole boards. My only complaint is I was unable to find instructions on exactly how to apply the vinyl to my cornhole board. I did use your chat support and also went on YouTube and found a random video but all in all very satisfied.
We LOVE our stickers!!!! They are perfect!! Wonderful quality (we have already stuck them everywhere and on everything!)!! I got matte texture and love it! We ordered them for an upcoming competition and we will absolutely be ordering more for another one coming up!!!
Every order I’ve had has been PERFECT! The quality is great and they’ve lasted! I have had four different stickers made through vinyl disorder and I have plans for many more!
Perfect quality and size. Easy to put on. The only thing we wish was the felt tip squeegee was included. We didn't realize we needed it until applying. We ordered one on Amazon but would be better if it came with it.
VinylDisorder went above and beyond with these custom stickers. We hand them out at car shows and events to spread the word of suicide awareness through our car that is dedicated to our late son that we lost to suicide over 6 years ago. They did such an amazing job on them and we could not be more pleased. We will definitely be doing more business with VinylDisorder without a doubt! Their kindness and understanding was even more astounding!
I love it when my artwork arrives in stickers. I grew up in the 80's and 90's. Skateboard art was something I always wanted to do. I would order the free stickers, or a self addressed envelope stickers and would always be amazed with what I got. Now that I'm my own stickers I feel that same vibe when I send a packet of them to my friends. I'm not making any money but it sure feels good to have something I can give to a friend that experienced the same thing. Then handing them out to random people is always fun. I've always wanted to do this and with you guys it has become a reality at a very affordable price. Thank you so much.
Beautiful! Just what I was hoping for and MORE! When I opened the package, it brought tears to my eyes. My father’s memory will live on. Thank you, Vinyl Disorder, for making my dreams come true. <3
Great company to work with. Customer service is responsive and helpful. The quality of the products are very good, great clarity and true to original design.
Purchased a 14" sticker for a drum set kick drum. The process was easy, it arrived in a good time and it looked amazing. We loved it.
The stickers came out perfect. They definitely glow in the dark. First time using Vinyl Discord and will definitely continue using them. There production and shipping was fast.
I ordered a custom wrap for our cornhole boards, and I am absolutely blown away by how they turned out. The gold metallic detailing of the tree and the script font against the matte black background looks incredibly elegant and sharp. The print quality is crisp, the material feels durable, and it completely transformed our boards into a premium, custom set. If you are looking to elevate your cornhole boards with a custom wrap, look no further. Highly recommend!
Much faster this time and excellent customer service. You guys are really stepping up. Amazing and rugged product as well. We are a motorcycle adventure group and these never fade or peel off even with endless washings.
Price, product and customer service were great. My only disappointment was that their production time was longer than I expected when I placed the order and I ended up having to pay an extra $45 for rush shipping. On the upside, I noticed that they included at least 5 extra of each color of the stickers that I ordered. I would definitely order from them again, but this time give much more lead time.
This is my first time designing stickers to sell. These exceeded my expectations and are beautifully printed and great quality. I will definitely be ordering my next order soon!
Loved how these came out! Excellent job and quality. Very impressed. Also, I was able to control my border size how I wanted to. Will certainly come back, thank you!
Absolutely killer quality from Vinyl Disorder. The colors are insanely vibrant, the print is razor sharp, and the die-cut came out perfect. The material feels thick and durable, not cheap or flimsy like a lot of stickers out there.
This “Puckered Butthole Racing Team” design turned out exactly how I envisioned it — clean lines, rich color saturation, and excellent detail even in the smaller text and outlines. Shipping was fast, packaging was solid, and the stickers arrived flawless.
If you’re looking for high-quality custom vinyl stickers that actually hold up and look professional, Vinyl Disorder absolutely delivers. Highly recommend and will definitely be ordering more.
I absolutely LOVE how these turned out!! This was my first time ordering from Vinyl Disorder, and I'll definitely be ordering again. The quality is impeccable, and I love that the stickers are weatherproof and waterproof. I tested one out on my water bottle, which I've run through the dishwasher now several times. There's no fading, no peeling, it's still perfect! I can't wait to order more stickers with some of my other artwork.
I've been buying from Vinyl Disorder for several years now and I absolutely love them! When it says permanent they mean it. All the vinyls I got from them from 3-4 years ago are still good and going on strong on my water bottles!
Very pleased with how the custom cornhole skin turned out. It was exactly as I was hoping for and was the perfect item for an engagement party. Shipping was also faster than expected.