Skip to product information
1 of 1

Monthly Calendar with Days Wall Decal

Item #: ca002

Regular price $10.00
Sale price $10.00 Regular price $22.99
Sale Sold out
Shipping calculated at checkout.

Loading your complete product options…

About this decal

Keep yourself strictly organized with the help of this plain weekly calendar decal from Vinyl Disorder. Our calendar decal features a grid of empty boxes with day of the week labels at the top of each row. Break your days down into five sections and never forget another appointment or to do list item again. Place this calendar wall decal on top of a dry erase board or chalk paint wall so that you can write directly on it. You can also place it on a pane of glass and use dry erase markers.

Monthly calendar wall decal with weekday header and date grid

A small detail. A personal statement.

A clean, single-color cut-vinyl design with open areas that reveal your surface. The backing liner and transfer tape help carry the design during installation; neither stays behind.

Choose the size for your space and the vinyl for your surface. For help, send our team the original item number, desired size and surface details.

Same attitude. A cleaner look.

A little guidance. A better result.

Simple tips for a better result.

Get the right fit

Measure the available space before choosing your size. Length refers to the longest side of this design.

Illustrative coastal example of measuring the longest side of cut vinyl, not its backing liner
Measure the design, not the liner.
The other side stays proportional.

Match your surface

Choose the material for your project. Smooth surfaces work best; texture, coatings and paint condition can affect adhesion.

Photorealistic coastal examples of indoor wall vinyl and outdoor vehicle-window vinyl Compare indoor and outdoor vinyl →

Apply with confidence

Use the transfer tape to keep the intricate design together while positioning and smoothing it onto your surface.

Illustrative coastal installation example: a squeegee smooths cut vinyl through its temporary transfer tape

Your surface becomes the background.

Open areas reveal your surface. No printed rectangle or added white border remains after the liner and transfer tape are removed.

Monthly calendar wall decal with weekday header and date grid
Coastal application example: a white wave decal on dark glass with the surface visible around the vinyl
Illustrative coastal application

Your surface.
Your statement.

Clean → Position → Apply & reveal

  1. Coastal application example: wiping a smooth vehicle window with a clean cloth Clean

    Prepare and dry your surface using the guidance suitable for its finish and your chosen vinyl.

  2. Coastal application example: a hinge holds transfer tape while the white backing liner is peeled away Position

    Keep the design on its transfer tape. Remove the backing liner carefully and align it in place.

  3. Coastal application example: smoothing a wave-shaped decal through transfer tape with a squeegee Apply & reveal

    Smooth through the transfer tape. Peel the tape back slowly, checking that every part of the vinyl stays on the surface.

Read the complete cut-vinyl installation guide →

Looks great just about anywhere

Dana Point-inspired application ideas. Match the vinyl to your surface; designs shown are illustrative examples.

Dana Point-inspired beach scene with a cut-vinyl wave on a vehicle window

Vehicles

Suitable glass and smooth panels with outdoor vinyl.

Dana Point-inspired harbor scene with a laptop and water bottle

Laptops & gear

Clean, smooth surfaces with an appropriate material.

Coastal surf-workshop scene with a cut-vinyl wave on a metal toolbox

Toolboxes

Smooth finished surfaces; check coatings first.

Coastal cottage scene with an illustrative wall-vinyl application

Walls & rooms

Suitable smooth indoor walls with wall vinyl.

Decal questions, answered

Are the color choices relate to the lines on the decal, or the actual background?
This decal is only the lines and the days of the week text, the middle of the boxes is die cut and removed so you can access the surface behind the decal (like a whiteboard or chalkboard). The color chosen would replace everything shown in black on the example design.
What is the individual box sizes for a decal that is 23x15.4?
When we scale this calendar decal to 23" wide, the date boxes are about 3.1" wide and 2.4" tall

What Vinyl Disorder customers are saying

Real customer reviews from across the Vinyl Disorder store.

Customer Reviews

Overall rating: 4.9 / 5 from 8062 reviews.

Customer photo review of Custom Sticker Sale - 3"

These rock! Great quality and bright colors. Perfect for sticker-bombing any and everywhere

Custom Sticker Sale - 3"

Customer photo review of Aztec Face Decal

Redecorating my room in an Aztec/Mayan theme and used 5 different decals on my closet door. They were so easy to put on, very inexpensive, and they look great. I love them!

Aztec Face Decal

Customer photo review of Custom Cornhole Board Wrap

I love my cornhole wrap that I purchased from vinyl disorder I successfully installed it on my cornhole boards. My only complaint is I was unable to find instructions on exactly how to apply the vinyl to my cornhole board. I did use your chat support and also went on YouTube and found a random video but all in all very satisfied.

Custom Cornhole Board Wrap

Customer photo review of Secret Sticker Sale

We LOVE our stickers!!!! They are perfect!! Wonderful quality (we have already stuck them everywhere and on everything!)!! I got matte texture and love it! We ordered them for an upcoming competition and we will absolutely be ordering more for another one coming up!!!

Secret Sticker Sale

Customer photo review of Seasonal Sticker Sale 2" - 9"

Every order I’ve had has been PERFECT! The quality is great and they’ve lasted! I have had four different stickers made through vinyl disorder and I have plans for many more!

Seasonal Sticker Sale 2" - 9"

Customer photo review of Custom Cornhole Board Wrap

Perfect quality and size. Easy to put on. The only thing we wish was the felt tip squeegee was included. We didn't realize we needed it until applying. We ordered one on Amazon but would be better if it came with it.

Custom Cornhole Board Wrap

Customer photo review of 50 - 2.5" Glow in the Dark Stickers

So cool! I got glow-in-the-dark on a whim and they were a hit. Kids love them! I put one on my phone and now it's easier to find at night too.

50 - 2.5" Glow in the Dark Stickers

Customer photo review of Custom Sticker Sale - 3"

These came out amazing and showed up fast! The print quality is great.

Custom Sticker Sale - 3"

Customer photo review of Cut to Shape Stickers

VinylDisorder went above and beyond with these custom stickers. We hand them out at car shows and events to spread the word of suicide awareness through our car that is dedicated to our late son that we lost to suicide over 6 years ago. They did such an amazing job on them and we could not be more pleased. We will definitely be doing more business with VinylDisorder without a doubt! Their kindness and understanding was even more astounding!

Cut to Shape Stickers

Customer photo review of 100 - 3" Custom Vinyl Stickers

I love it when my artwork arrives in stickers. I grew up in the 80's and 90's. Skateboard art was something I always wanted to do. I would order the free stickers, or a self addressed envelope stickers and would always be amazed with what I got. Now that I'm my own stickers I feel that same vibe when I send a packet of them to my friends. I'm not making any money but it sure feels good to have something I can give to a friend that experienced the same thing. Then handing them out to random people is always fun. I've always wanted to do this and with you guys it has become a reality at a very affordable price. Thank you so much.

100 - 3" Custom Vinyl Stickers

Customer photo review of Custom Vinyl Decal - Single Color

Beautiful! Just what I was hoping for and MORE! When I opened the package, it brought tears to my eyes. My father’s memory will live on. Thank you, Vinyl Disorder, for making my dreams come true. <3

Custom Vinyl Decal - Single Color

Customer photo review of Custom Sample Sticker

The sticker came fast and worked perfectly! My skunk is very happy! The ordering process was easy. I’ll be back!

Custom Sample Sticker

Customer photo review of 100 - 3" Custom Vinyl Stickers

Super great gift for a Marine Corps union…. Everyone loved them…. They are very weather resistant and do great on cups, even getting washed…

100 - 3" Custom Vinyl Stickers

Customer photo review of Site Reviews

Great company to work with. Customer service is responsive and helpful. The quality of the products are very good, great clarity and true to original design. Purchased a 14" sticker for a drum set kick drum. The process was easy, it arrived in a good time and it looked amazing. We loved it.

Site Reviews

Customer photo review of Custom Sticker Sale - 3"

Motorbike event sticker was a hit. Quality decal and fast shipping, thanks!

Custom Sticker Sale - 3"

Customer photo review of Cut to Shape Stickers

Excellent service, quality stickers and fast turnaround, all at a very affordable price. Thanks so much!

Cut to Shape Stickers

Customer photo review of 50 - 2.5" Glow in the Dark Stickers

The stickers came out perfect. They definitely glow in the dark. First time using Vinyl Discord and will definitely continue using them. There production and shipping was fast.

50 - 2.5" Glow in the Dark Stickers

Customer photo review of Custom Cornhole Board Wrap

I ordered a custom wrap for our cornhole boards, and I am absolutely blown away by how they turned out. The gold metallic detailing of the tree and the script font against the matte black background looks incredibly elegant and sharp. The print quality is crisp, the material feels durable, and it completely transformed our boards into a premium, custom set. If you are looking to elevate your cornhole boards with a custom wrap, look no further. Highly recommend!

Custom Cornhole Board Wrap

Customer photo review of 100 - 3" Custom Vinyl Stickers

It was super easy to upload my image and send it off to get my sticker order completed. They are absolutely perfect!!!

100 - 3" Custom Vinyl Stickers

Customer photo review of 100 - 4" Custom Vinyl Stickers

Much faster this time and excellent customer service. You guys are really stepping up. Amazing and rugged product as well. We are a motorcycle adventure group and these never fade or peel off even with endless washings.

100 - 4" Custom Vinyl Stickers

Customer photo review of 100 - 3" Custom Vinyl Stickers

Ep8c stuff. Hope the reorder starts working again. My go to sticker place. High quality and can handle all the metal! 🤘🤘🤘🤘🤘

100 - 3" Custom Vinyl Stickers

Customer photo review of Cut to Shape Stickers

Price, product and customer service were great. My only disappointment was that their production time was longer than I expected when I placed the order and I ended up having to pay an extra $45 for rush shipping. On the upside, I noticed that they included at least 5 extra of each color of the stickers that I ordered. I would definitely order from them again, but this time give much more lead time.

Cut to Shape Stickers

Customer photo review of Custom Sticker Sale - 3"

Excellent work, great quality. This is my third custom sticker order!

Custom Sticker Sale - 3"

Customer photo review of Custom Sticker Sale - 3"

This is my first time designing stickers to sell. These exceeded my expectations and are beautifully printed and great quality. I will definitely be ordering my next order soon!

Custom Sticker Sale - 3"

Customer photo review of Custom Sticker Sale - 3"

Absolutely fantastic!!! Stickers came out great! Super fast service! Fast shipping. Will be our go to for all future needs.

Custom Sticker Sale - 3"

Customer photo review of Seasonal Sticker Sale 2" - 9"

Loved how these came out! Excellent job and quality. Very impressed. Also, I was able to control my border size how I wanted to. Will certainly come back, thank you!

Seasonal Sticker Sale 2" - 9"

Customer photo review of 100 - 4" Custom Vinyl Stickers

Absolutely killer quality from Vinyl Disorder. The colors are insanely vibrant, the print is razor sharp, and the die-cut came out perfect. The material feels thick and durable, not cheap or flimsy like a lot of stickers out there. This “Puckered Butthole Racing Team” design turned out exactly how I envisioned it — clean lines, rich color saturation, and excellent detail even in the smaller text and outlines. Shipping was fast, packaging was solid, and the stickers arrived flawless. If you’re looking for high-quality custom vinyl stickers that actually hold up and look professional, Vinyl Disorder absolutely delivers. Highly recommend and will definitely be ordering more.

100 - 4" Custom Vinyl Stickers

Customer photo review of Circle Stickers

I absolutely LOVE how these turned out!! This was my first time ordering from Vinyl Disorder, and I'll definitely be ordering again. The quality is impeccable, and I love that the stickers are weatherproof and waterproof. I tested one out on my water bottle, which I've run through the dishwasher now several times. There's no fading, no peeling, it's still perfect! I can't wait to order more stickers with some of my other artwork.

Circle Stickers

Customer photo review of Custom Sticker Sale - 3"

I've been buying from Vinyl Disorder for several years now and I absolutely love them! When it says permanent they mean it. All the vinyls I got from them from 3-4 years ago are still good and going on strong on my water bottles!

Custom Sticker Sale - 3"

Customer photo review of Custom Cornhole Board Wrap

Very pleased with how the custom cornhole skin turned out. It was exactly as I was hoping for and was the perfect item for an engagement party. Shipping was also faster than expected.

Custom Cornhole Board Wrap

Customer photo review of Custom Sticker Sale - 3"

Stickers were amazing quality, as always! I'm sure I'll be back again in the future.

Custom Sticker Sale - 3"

Loading genuine product reviews…

Read store-wide Vinyl Disorder reviews →