Choose your learning path
Ordering & proofs
Review every design and its exact configuration before choosing the approval path. Approving a live preview and asking for an emailed Manual Proof are different actions.
Start with your situation
| Your project or question | What to check |
|---|---|
| The current preview is ready | Inspect artwork, spelling, proportions, cut edge, material, finish and quantity before approving. |
| Something needs a person’s review | Choose the Manual Proof route offered by that product and provide specific notes before approval. |
| The order has a deadline | Separate preparation, approval, production and carrier transit. Ask us to confirm an in-hand plan before ordering. |
Learn in this order
Worked example: Two nearly identical logo versions
Version A uses the current website address; version B uses an old one. Review each design rather than approving one thumbnail for the whole order. Confirm the saved version and configuration when reordering. Changes to artwork, size or material may need a new review and do not silently replace an approved job.
A common question
Will an emailed proof always follow live approval?
No. Use the approval choice actually shown by the product. Do not assume another review will occur after you have already authorized the live preview.
Before you continue
Keep the exact artwork version, finished measurements, selected construction and intended use together. If the product or surface is uncertain, resolve that question before approval. Ask our team about your project.
Search ordering & proofs articles and guides
The library includes eligible published articles. If it is unavailable, use the complete Sticker Tips archive and Ideas archive.
Take the checklist with you
Printable proof-review checklist (PDF). Version 1.0, October 8, 2026. The download supplements this guide; check the current product instructions before use.
Follow the current simple sticker builder
These are actual controls, captured October 8, 2026. Product interfaces and supported options can differ. Check the workflow for the exact product you are ordering.
1. Start with your original artwork

- Upload your strongest original artwork using Upload your image. Preserve its incoming embedded color profile. The example logo does not mean your own file has been received.
- Inspect the preview at a useful zoom and check the blue cut edge when it is generated. The blue production guide is not printed artwork.
- If you choose to send artwork after purchase, follow the order-email instructions. The team still needs your artwork and required proof approval before printing.
2. Check the complete configuration

- Check finished width and height together. Confirm the actual cut shape and edge treatment separately from the material and laminate finish.
- Material identifies the base; finish identifies the selected top treatment. Confirm the supported combination rather than treating two similar names as interchangeable.
- Check quantity and the selected summary together. Verify the purchased unit and every design’s configuration before continuing.
3. Choose the appropriate approval path

- Approve this preview: after upload, review the artwork, size, edge and blue cutline before choosing this path. Follow the exact approval action shown by the current builder.
- Email me a manual proof: upload the artwork for the team to prepare the final proof. Review and approve that final proof under the current order workflow.
- Send artwork after purchase: the displayed workflow says to reply to the order email with the artwork. Nothing prints until the artwork is received and the required proof is approved.
- A later note is not a substitute for the approval state of the exact design. Resolve changes before approval and check the final cart configuration.
Choose the approval path for this exact design
Read the diagram
- Approve this preview: upload first, then inspect the artwork, spelling, size, edge, blue cutline and configuration. Complete the actual approval action shown by that builder. Do not assume another emailed review will follow.
- Email me a manual proof: submit artwork and request the offered manual-proof route. The team prepares the final proof, which needs your review and approval under the current order workflow.
- Send artwork after purchase: use the offered route and send the actual artwork as directed in your order email. The displayed workflow requires receipt of the artwork and approval of the proof before printing.
- Review each design and version separately. Selecting a radio button alone is not a substitute for completing the actual required approval action. A later message does not silently replace an already approved job.
Production and carrier transit are separate stages
Read the diagram
- 1. Artwork readiness: Provide usable artwork and resolve the exact configuration.
- 2. Approval where required: Complete the approval path for the exact design/version.
- 3. Production: The approved job enters the product’s production workflow.
- 4. Quality control: The finished job is checked before dispatch.
- 5. Dispatch: The parcel leaves for the selected delivery service.
- 6. Carrier transit: The carrier moves the dispatched parcel.
- 7. In hand: Plan for receipt before the event or installation need.
- Faster shipping addresses carrier transit after dispatch. It does not automatically reduce artwork preparation, approval, production or quality control.
- For a deadline, work backward from the required in-hand date and confirm the whole plan with the team before ordering. Current estimates belong in the live product/policy content, not fixed day counts in this diagram.
